Royal Academy of Music
Mechanical and electrical feasibility study in preparation for a theatre refurbishment. |
 |
|
 |
 |
 |
 |
 |
 |
|
Neasden Junction
Install, test and pre-commission Neasden traction sub-station as part of SSR lot 1A power upgrade... |
 |
|
 |
 |
 |
 |
 |
 |
|
Cable Jointing
Carry out the jointing of all cables associated with the provision of 7 New Substations... |
 |
|
 |
 |
 |
 |
 |
 |
|
John Lewis Oxford Street
The project at John Lewis was to upgrade all ceiling lighting, power & chilled ventilation to women’s fashion department & toilets on the first floor. |
 |
|
 |
 |
 |
 |
 |
 |
|
Lillie Bridge
The new trains will be stabled at Lillie Bridge Depot close to Earls Court. The DC traction power for the Depot was previously derived from the District main line between Barons Court and Earls Court. |
 |
|
 |
 |
 |
 |
 |
 |
|
Marlborough Road
Emico have been awarded the containment and cabling installation works for the New LUL DC Sub station located on the existing disused Marlborough Road Station site. |
 |
|
 |
 |
 |
 |
 |
 |
|
Asset Stabilisation
Under the TFL LUL Nominee SSL Ltd framework agreement –Emico have awarded the Electrical periodic testing of approximately 120 line side and remote buildings on BCV and SSL lines. |
 |
|
 |
 |
 |
 |
 |
 |
|
T12 to T8 Lamp Conversion
Under the TFL LUL Nominee BCV & SSL Ltd framework agreement – Emico have been awarded the lamp conversions for 5 sites on BCV and SSL lines. |
 |
|
 |
 |
 |
 |
 |
 |
|
Stratford Station
Progress is now becoming noticeable for the paying public. 2 No lifts in the Western Subway have been commissioned and brought into use. |
 |
|
 |
 |
 |
 |
 |
 |
|
Digital Advertising on the Underground
Emico secured the second phase contract to replace, re-wire and refurbish the Digital Escalator Panels. |
 |
|
 |
 |
 |
 |
 |
 |
|
East London Line
Emico have secured the mechanical and electrical works at 4 stations on the East London Line. |
 |
|
 |
 |
 |
 |
 |
 |
|
Metronet Framework Agreement
Emico have secured a framework agreement with Metronet (LUL Nominee SSL) for the Supply of Electrical Services and equipment |
 |
|
 |
 |
 |
 |
 |
 |
|
Belgrave Square
A high end prestigious development carried on behalf of Solland Projects LLP. |
 |
|
 |
 |
 |
 |
 |
 |
|
New Cross Gate Depot
The installation is now entering a commissioning phase at both the Maintenance Shed and the Wheel Lathe Heavy Clean Shed. |
 |
|
 |
 |
 |
 |
 |
 |
|
BAM Nuttall - Blackfriars Station
Blackfriars station is being completely re-furbished including a commercial office block development. |
 |
|
 |
 |
 |
 |
 |
 |
 |
Victoria Plaza Shopping Centre
Emico have been appointed by Meica to carry out the management, installation and test & commission of the mechanical and electrical services... |
 |
 |
 |
 |
 |
 |
 |
 |
|
London Underground goes Digital
Emico are working with CBS Outdoor to prepare detailed designs for the XTP installation that is to be rolled out. |
 |
|
 |
 |
 |
 |
 |
 |
|
John Lewis Food Hall
Emico successfully installed the lighting and power within the food hall at John Lewis's flagship Oxford Street store. |
 |
|
 |
 |
 |
 |
 |
 |
|
South London House
Electrical and Mechanical refurbishment of 4-story office block which is a Train Crew Accommodation block at Elephant and Castle. |
 |
|
 |
 |
 |
 |
 |
 |
 |
Intercontinental Hotel Hyde Park Corner
Fast track refurbishment of hotel. Emico carried out the electrical installation of the rooms and communal areas... |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Makro
Fast track (16 week) refurbishment of a functioning Makro store working nights and days... |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Neasden Depot
Services provided include air conditioning, ductwork, plumbing, perimeter heating as well and a complete electrical fitout of both houses. |
 |
 |
 |
 |
 |
 |
 |
 |
Morden Station SMEP & SFA
Complete electrical refurbishment; plumbing, air conditioning and comfort cooling refurbishment of station. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
PSU: Southern Region Network Rail
Upgrade of 33kV oil filled feeders to 3 x 300mm2 XLPE singles with new pilot cables... |
 |
 |
 |
 |
 |
 |
 |
 |
|
LUL: Tuffnell Park
A Section 12 station where the installation was hampered by the fact that there is no escalator at Tufnell Park Station... |
 |
|
 |
 |
 |
 |
 |
|
CTRL St. Pancras
Working on behalf of Mowlem Engineering Power for RLE Emico carried out 3 separate contracts on this project.. |
 |
|
 |
 |
 |
 |
 |
|
Northam depot, Southampton
Working for Fitzpatrick Contractors Ltd, Emico were employed to install a 33kV feeder to the new Siemens Train Care facility... |
 |
|
 |
 |
 |
 |
 |
 |
 |
West Middx Hospital
Installation of all electrical services associated with Block T, a refurbished wing of the hospital... |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Excel
The first project carried out by the company. Emico were employed by ABB Building Technologies for the installation of... |
 |
 |
 |
 |