Slade Green

Introduction

Make an Enquiry

Emico were engaged by Costain to undertake the M&E Installation as part of the 12 Car enhancement works at Slade Green Depot. This project consisted of additional siding capacity which was provided to accommodate longer trains along with modification of existing rail roads to allow for 12 car train berthing. Emico carried out M&E enabling works and design necessary to modify the existing depot M&E services and the installation of new M&E services. Design involved provision of lighting, 110V socket outlets, water points, trace heating, CMS, LV power distribution.

Open Gallery

Emico gained successful Category 1 design sign off first time after establishing a successful and collaborative multi-disciplinary partnership with the other disciplines. After Design Stage, headed up the Construction and Delivery teams to undertake the installation, commissioning and successful handback into service all on time with manuals and completion certificate delivered and accepted one week after construction team left site.

Open Gallery

Slade Green was another example of Emico’s underlying commitment to “Right First Time”, across all phases of the project from Design, Construction to Client Handback.

Back to Projects
Next Project
Crossrail - 13 Stations Upgrade and Refurbishment